A practical way to price the whole custom job, set a sensible minimum charge and check whether the quote actually paid.

By Sam 3 November 2026
Generated editorial phone photograph of a small engraving workshop quote setup with oak blanks, callipers, calculator, packaging and job notes.
Generated editorial workshop scene: a useful quote includes the blank, setup, production, finishing and packing—not only laser time.

The laser might engrave a plaque in four minutes. The job does not take four minutes.

There is the enquiry, blurry logo, proof, test piece, setup, customer correction, cleanup and packing. Small custom jobs are particularly good at hiding all that work behind one tiny object.

Here is my blunt take: price the complete job, not the time the beam is switched on. Give every custom order a setup floor, separate labour from machine cost, and compare the estimate with what really happened after the job leaves. I would rather lose a bargain job at the quote stage than win it and pay for the privilege of making it.

The quick version

Generated editorial phone photograph of a calculator, oak blanks, offcuts, masking tape and handwritten cost notes on a worn workbench.

Generated editorial scene: put material, waste and setup beside the calculator before choosing a selling price.

Part of the quoteWhat belongs in it
MaterialsSaleable blanks, test pieces, likely waste and consumables
SetupMessages, artwork check, proof, file preparation, jig and machine setup
Production labourLoading, supervision, cleaning, finishing and packing
Machine costMaintenance, extraction, consumables, wear and eventual replacement
Selling costsPlatform or payment fees, where they apply
Delivery and taxShown clearly rather than buried inside a guessed margin
ProfitAdded only after the real job cost is visible

Useful formula: selling price before tax and separately charged delivery = total job cost ÷ (1 − target gross margin)

The worked figures below are an example, not measured Makers Army workshop data or a recommended hourly rate. Use the formula with your own costs. The main catch is that the calculation gives you a price floor; it does not prove customers will value the job at that price.

Start with the work customers never see

Split the quote into fixed costs and costs that grow with the quantity.

Fixed costs happen whether the order contains one item or fifty:

  • enquiry, quote and order administration;
  • artwork checks, repairs and proofing;
  • locating or building a jig; and
  • machine setup and production notes.

Variable costs normally rise as you add units:

  • blanks, spares and consumables;
  • loading, machine and finishing time;
  • packaging; and
  • transaction or marketplace fees.

That split matters. If a one-piece order and a fifty-piece order both need 35 minutes of file preparation, the setup cost does not magically disappear on the small one. It simply has fewer units across which to spread itself.

The Australian Government's pricing guidance makes the same broad point: calculate the full cost of making and supplying the product, including labour and overheads, then consider margin and the value to the customer. Competitor prices are useful context, but copying somebody else's number does not tell you whether it covers your workshop.

Your labour rate and machine rate are not the same thing

This is where quotes get muddy.

Your labour rate has to cover the cost of a person's time, including the business costs around it. Depending on the workshop, that may include administration, leave, superannuation, insurance, rent, software and hours that cannot be billed directly.

Your machine rate covers extraction, optics, tubes or modules, servicing, electricity, cleaning, consumables and eventual replacement. Work it out from your own costs and realistic productive hours, not a stranger's workshop.

Some minutes contain both. If the machine is running whilst you supervise it, the quote can include production labour and machine use for the same period. That is not double charging; they are two different costs. And do not build a price around wandering away from the laser. Follow the manufacturer’s instructions, use suitable extraction and material, and remain present as required for fire safety.

Build the minimum charge from a real setup package

Overhead workshop photograph of a laptop surrounded by measuring and hand tools.

Artwork preparation, measuring and job administration form part of a sensible minimum charge even when the laser is not running.

A minimum charge is the lowest amount at which a custom job can pass through the workshop without stealing time from everything else.

Define what it includes. For example:

  • one supplied artwork file checked for production;
  • one digital proof;
  • one round of minor corrections;
  • one test on a spare or approved scrap piece;
  • standard machine setup; and
  • basic order administration.

Time that package over several real jobs and apply your labour and consumable costs. Production units, special materials, redraws, extra proofs, rush work and delivery sit on top.

A genuine reorder can have a lower setup price when the artwork, material, jig and production file are unchanged. A new logo, product size or name list is still work, even when it is called a quick tweak.

A worked twelve-plaque quote, with the assumptions exposed

Hands using a calculator beside a laptop, notebook and phone while preparing a quote.

A worked quote should be checkable line by line with your own material, labour, machine and finishing figures.

Here is the arithmetic from the existing article rebuilt as a proper example. These figures are illustrative Australian dollars, not a price list and not a measured Makers Army job.

Cost itemExample calculationCost
Twelve blank plaques12 × $3.50$42.00
Two spare blanks2 × $3.50$7.00
Artwork, proof and setup labour35 minutes × $45/hour$26.25
Loading, cleanup and finishing labour30 minutes × $45/hour$22.50
Machine use75 minutes × $8/hour$10.00
Packaging12 × $0.70$8.40
Illustrative total job cost$116.15

Suppose the business chooses a 40% gross margin for this example. The calculation is:

$116.15 ÷ (1 − 0.40) = $193.58

That is about $16.13 per plaque before tax, separately charged delivery or other excluded costs. Present a clean quoted figure if you like, but round only after the full calculation.

Do not copy the 40% target. Your margin depends on overheads, market, capacity, risk and business goals. The useful bit is that every assumption can be replaced with a real number.

Margin and markup are different — and the gap is not tiny

This catches plenty of otherwise sensible quotes.

If you add a 40% markup to the $116.15 cost, you get:

$116.15 × 1.40 = $162.61

The gross profit is $46.46, which is only about 28.6% of the selling price.

If you want a 40% gross margin, you divide by 0.60 and get $193.58. The gross profit is $77.43, which is 40% of the selling price.

That is a $30.97 difference on one modest order. Neither percentage is automatically correct, but they are not interchangeable. The Australian Government's margin and markup explanation is worth bookmarking if those two formulas keep trying to swap hats in your spreadsheet.

Put the boundaries in the written quote

A price without scope is an invitation for the job to grow legs.

Your quote should state:

  • the exact product, material, size and quantity;
  • the artwork revision and personalisation list;
  • what file preparation is included;
  • how many proofs or correction rounds are included;
  • the expected finish and packaging;
  • what happens if customer-supplied stock is unsuitable or inconsistent;
  • the delivery or collection arrangement;
  • applicable tax and fees;
  • the quote expiry date;
  • the production timing after approval; and
  • how changes are priced after approval.

If you operate in Australia, the Government's written quote checklist explains that an accepted quote can become binding. Be clear, use plain language and get professional advice where your circumstances need it.

One particularly useful line is:

This price includes one proof and one round of minor artwork corrections. Changes to the product, material, dimensions, artwork or approved wording will be quoted as a variation before production continues.

Now both sides know where the original job ends.

Record the actual job before your memory improves it

Generated editorial phone photograph of a job-review clipboard, timer, one clean oak sample and one rejected scorched sample.

Generated editorial scene: compare the estimate with the actual time, waste and rejects before quoting the next batch.

The quote is an estimate. The finished job is evidence.

As soon as the order is complete, record estimated and actual figures for:

  • artwork and customer communication time;
  • setup time;
  • machine time;
  • hands-on production time;
  • blanks used and blanks rejected;
  • finishing and packing time; and
  • fees or delivery costs that were missed.

Add one reason for any large difference. “Logo needed redraw”, “warped blank” and “fixture already existed” are more useful than a red number with no explanation.

After ten similar jobs, review the pattern. If every logo order overruns the artwork allowance, change the allowance. If a jig cuts loading time, update the repeat-job template. If a product only works when you donate an hour, raise the price, simplify the offer or stop selling it.

That last option is allowed, by the way.

Cost is your floor; value helps decide the final price

A cost-based quote stops you selling below the workshop's reality. It does not decide what a personalised product is worth to the customer.

A rush award, a replacement part that saves an expensive assembly and a generic coaster may have similar machine minutes but different value. Consider the result, deadline, design work and alternatives, with the cost calculation underneath.

If the required price feels too high, change the job before cutting the margin out of it. Offer a standard product size, a stock material, one approved font, fewer proof rounds, a longer lead time or a larger quantity. Make the cheaper option genuinely cheaper to produce.

Price the next enquiry with this checklist

Hands wrapping an item with tissue paper inside a cardboard shipping box.

Finishing and packing still cost time after the machine has stopped.

  • I have separated fixed setup from per-unit production.
  • Materials include test pieces and realistic waste.
  • Artwork, proofing and customer messages have time against them.
  • Labour and machine costs use rates from this workshop.
  • Finishing, packing, selling fees, delivery and tax are visible.
  • The margin formula is not being confused with markup.
  • The minimum charge has a defined scope.
  • The quote names the product, revision, included changes and exclusions.
  • I will record actual time and waste after the job.

For the next small order, do not build a grand pricing system. Start a timer, use the six cost groups above and write down what actually happens. One honest completed job will improve your quote template more than another hour of staring at competitor prices.

Make the invisible work visible. Then charge for the job you are really doing.

Sources

  1. 1.Australian Government — Choose a pricing strategy
  2. 2.Australian Government — Margin and markup
  3. 3.Australian Government — Prepare quotes

Share this article

Know someone who would enjoy this? Pass it along.