Stop Underquoting Engraving Jobs: A Pricing Worksheet That Includes Every Cost

A free engraving quote calculator and CSV worksheet that counts material, spoilage, setup, hands-on time, machine time, packaging and payment fees once — then sets a true profit margin. Two fully worked, illustrative examples: a one-off plaque and a batch of 20.

By Sam Groves 5 November 2026
Makers Army engraving quote calculator showing an illustrative one-off plaque priced at $97.24 before sales tax
Screenshot of the Makers Army engraving quote calculator (original Makers Army tool) with illustrative sample values. Rights: Makers Army original.

A walnut plaque looks like an $18 job. That's the price of the blank, and it's the number your brain grabs first when a customer asks "how much?"

Run the full numbers on the illustrative plaque in this guide and the cost is $61.45 before you've made a cent. Quote $45 because "the wood was only $18" and you've paid the customer to let you engrave their plaque.

So here's the payoff up front: a free pricing worksheet that counts every cost once — material, spoilage, setup, hands-on time, machine time, packaging and payment fees — then sets a real profit margin on the final price. It comes as a working browser calculator, a filled-in CSV for each worked example, and a spreadsheet version with the formulas visible so you can check my maths.

Open the engraving quote calculator · Download the formula worksheet (CSV)

The Makers Army engraving quote calculator loaded with the illustrative one-off plaque sample, showing a $61.45 total cost and a $97.24 quote before sales tax The actual calculator with the plaque sample loaded. Notice that the blank is less than a third of the cost — setup time is bigger than the wood.

Quick facts

What you getBrowser calculator, two filled sample CSVs, one formula CSV
Cost / accountFree, no sign-in, runs in your browser
Works withAny laser, CNC or engraving shop; any spreadsheet app that opens CSV
TimeAbout 10 minutes to enter your own rates the first time
What I checkedThe formulas, both worked examples and the CSV output, with automated tests
Not testedI haven't priced a real customer job with these numbers — every rate below is an illustrative assumption
The catchThe worksheet is only as honest as your rates. Guess your machine rate and you'll get a confident wrong answer

The cheap part is not the expensive part

Most underquoting comes from pricing the thing you can hold. The blank has a receipt. Your 45 minutes of artwork fiddling doesn't.

The worksheet splits every job into seven lines:

  1. Material and consumables — the blank, plus masking, finish, adhesive, magnets, felt pads.
  2. Spoilage allowance — a percentage on material, because some blanks crack, warp or get engraved upside down. (Ask me how I know that one's possible. Actually, don't.)
  3. Setup and design — artwork cleanup, layout, proofing, test burns, focusing and jig setup. Counted once per job.
  4. Hands-on time per item — loading, unloading, cleaning residue, finishing.
  5. Machine time per item — only the minutes the machine is actually running.
  6. Packaging per item.
  7. Payment or marketplace fees — a percentage of the final price plus any fixed fee per order.

Then profit goes on top as a margin of the final price. Sales tax stays out entirely; more on that below.

Worked example 1: the one-off plaque

These are illustrative sample assumptions, not supplier prices or market rates. Swap in your own.

InputSample value
Walnut blank, 8 × 10 in$18.00
Consumables (masking, finish)$1.50
Spoilage allowance10%
Setup and design45 min
Hands-on time15 min
Machine run time35 min
Labour rate$30/hr
Machine rate$12/hr
Packaging$3.00
Payment fee6.5% + $0.30
Target margin30%

Here's how each line works out:

  • Materials: (18 + 1.50) × 1.10 = $21.45
  • Setup: 45 ÷ 60 × $30 = $22.50
  • Hands-on: 15 ÷ 60 × $30 = $7.50
  • Machine: 35 ÷ 60 × $12 = $7.00
  • Packaging: $3.00
  • Total cost: $61.45

Now the price. You want 30% of the final price left as profit after fees. Fees are also a percentage of that price, so the formula is:

Price = (cost + fixed fee) ÷ (1 − fee% − margin%)

(61.45 + 0.30) ÷ (1 − 0.065 − 0.30) = $97.24

Check it reconciles: fees are 6.5% × 97.24 + 0.30 = $6.62. Profit is 97.24 − 6.62 − 61.45 = $29.17, which is 30.0% of the price. Cost + fees + profit = $97.24. No missing dollars.

Labelled workflow diagram splitting the $97.24 plaque quote into materials, setup, hands-on time, machine time, packaging, fees and profit Workflow diagram, not a photo: the same quote as a stacked bar. Setup ($22.50) is nearly as big as the profit — which is exactly why one-offs cost more per item.

The calculator also shows a break-even price of $66.04: the lowest quote that covers costs and fees with zero profit. Treat that as your floor, not your target.

Margin is not markup (and the gap eats your profit)

This is the one that catches people. Both use the same profit, divided by different things:

  • Markup = profit ÷ cost. Here, 29.17 ÷ 61.45 = 47.5%.
  • Margin = profit ÷ price. Here, 29.17 ÷ 97.24 = 30.0%.

Same job, same dollars, two very different percentages.

Labelled diagram comparing a 47.5% markup on cost with a 30% margin on price for the same $29.17 profit Workflow diagram: the trap at the bottom is the common mistake — adding 30% to cost and assuming you kept 30%.

If you "add 30%" to cost, you'd quote $61.45 × 1.30 = $79.89. Take out 6.5% + $0.30 in fees ($5.49) and you keep $12.95. That's a 16.2% margin. You thought you priced at 30, you actually priced at 16, and you'll only notice at tax time when the account looks oddly thin.

My call: pick a target margin and let the formula work backwards to a price. If you prefer thinking in markup, fine — just don't mix the two in the same conversation.

Worked example 2: a batch of 20 gift coasters

Batches are where the worksheet earns its keep, because the trap flips. Instead of underpricing setup, people multiply it by 20.

Illustrative assumptions: 20 coasters, $4.20 blank, $0.40 consumables, 5% spoilage, 60 minutes setup for the whole job, 3 minutes hands-on and 6 minutes machine time each, same $30 and $12 rates, $1.25 packaging each, same fees and margin.

LineCalculationCost
Materials20 × (4.20 + 0.40) × 1.05$96.60
Setup (once)60 ÷ 60 × $30$30.00
Hands-on20 × 3 ÷ 60 × $30$30.00
Machine20 × 6 ÷ 60 × $12$24.00
Packaging20 × $1.25$25.00
Total cost$205.60

Quote: (205.60 + 0.30) ÷ 0.635 = $324.25, or $16.21 per coaster. Fees $21.38, profit $97.28, margin 30.0%.

The engraving quote calculator loaded with the illustrative 20-coaster batch sample, showing a $324.25 quote and $16.21 per item The real calculator with the batch sample. Setup is $30 for the whole order — $1.50 a coaster — instead of $30 a coaster.

If you'd charged that 60-minute setup on every coaster, you'd have added $570 of imaginary labour and quoted yourself out of the order. Underquoting and overquoting usually come from the same place: not knowing which costs are per job and which are per item.

How to avoid counting the same minute twice

Time is the slipperiest input. A few rules I'd stick to:

  • Machine minutes are not labour minutes. If you're free to package the last batch while the laser runs, that run time goes in machine time only.
  • If you must babysit the machine (and with some materials you should — never leave a running laser unattended if your manufacturer's manual says not to), add that supervision to hands-on time as well. That's not double-counting; you genuinely can't do anything else.
  • Setup belongs to the job. Artwork, proof emails, test burns and jig alignment happen once whether the order is 1 or 200.
  • Put overheads in the machine rate, not on top. Power, extraction filters, lens and tube wear, maintenance and a slice of rent all live in that $12/hr sample figure. Add them again as a separate "overhead" line and you've charged twice.

Where your machine rate actually comes from

The $12/hr in the examples is an assumption. Here's a sensible way to build your own:

  1. Add up a year of machine-related costs: expected replacement parts, filters, maintenance, insurance, a share of rent and an amount to put aside for eventually replacing the machine.
  2. Estimate electricity from your machine's and extractor's rated power and your utility's commercial rate. The US EIA publishes average commercial electricity prices by state as a sanity check.
  3. Divide by the hours you realistically run per year — not the hours you hope to.

The SBA's guide to calculating business costs is a good prompt for the costs people forget.

Payment fees and sales tax: check, don't assume

The worksheet's 6.5% + $0.30 is a placeholder, not anyone's real rate. Card processors and marketplaces publish their own fee schedules, and they change — check Square's US pricing or Stripe's pricing, or your marketplace's current fee page, then enter what you actually pay.

Sales tax is deliberately not in the price. Whether you collect it depends on your state and what you're selling, and it isn't your revenue anyway. The IRS keeps a list of state tax agency links — find your state's rules, and collect tax on top of the quote where required.

Pitfalls I'd watch for

  • A 0% spoilage allowance. Unless you've never ruined a blank, you have spoilage.
  • Pricing your labour at $0 "because it's my business." Then the business can't ever afford to pay you or anyone else.
  • Reusing the plaque's per-item rate for a batch — or the batch rate for a one-off.
  • Fee% plus margin% approaching 100. The calculator refuses anything at or above 100%, because no price can satisfy it.
  • Trusting the sample numbers. They make the maths readable. They are not your costs.

What I'd do with this today

Open the calculator, load the plaque sample, and replace every value with your own — start with your last real job. If your new quote is noticeably higher than what you charged, that's not the calculator being greedy. That's the job you quietly paid for.

Then download a filled example so you can see the layout in a spreadsheet: plaque sample CSV or 20-coaster batch CSV. The formula version keeps every calculation visible, so you can edit it, break it and check it yourself.

Open the free engraving quote calculator →

Sources

  1. 1.Makers Army — Engraving quote calculator (original tool, illustrative samples)
  2. 2.US EIA — Average price of electricity by state and sector
  3. 3.SBA — Calculate your business costs
  4. 4.Square — US payment processing pricing
  5. 5.Stripe — Pricing
  6. 6.IRS — State government websites (tax agency links)

Share this article

Know someone who would enjoy this? Pass it along.